    Where do I start? - Bloor South West

    Update Well after thermal images, air leakage tests, physical inspections etc there is a list of rectification work which is required. Bloor want to fit hallways, bathrooms and two other rooms with electric panel heaters as their consultant says the underfloor heating is not up to scratch for...
  2. B

    Where do I start? - Bloor South West

    6 us have been trying for 13 months now to get Bloor SW to sort out problems with our new homes. The houses were all completed prior to us moving in and are timber framed with electric underfloor heating. The hallways and rooms are not all warm enough even with the heating on 24/7 although two...