Snagging.org Forum Snagging Inspections
Old 17th May 2006, 07:51   #1
Junior Member
 
Join Date: May 2006
Posts: 4
The Way Beswick
Default Changes in Design

Can a developer make major structural changes to the design of a new home without notificatation and that clearly contravene the plans, both marketing and working drawings.

The extent of the structural changes deviates from the marketing of the property and causes an obstruction?

In the next build phase, the developer has reverted back to the original working drawings/plans?

cheers

Gary

Post edited by: The Way Beswick, at: 2006/05/17 06:52
The Way Beswick is offline   Reply With Quote
Old 19th May 2006, 13:49   #2
Junior Member
 
Join Date: May 2006
Posts: 2
dave.green
Default Re:Changes in Design

immoral but probaly able to do that, they normally clause all of the drawings plans to allow them to change design.

What kind of changes have they made to the property?
dave.green is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off



All times are GMT +1. The time now is 00:37.
Powered by vBulletin
Copyright © 2000-2009 Jelsoft Enterprises Limited.



Content Relevant URLs by vBSEO 3.3.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34